Contract award
Contents |
[edit] Introduction
The term ‘contract award’ refers to the process of formally notifying a tenderer that they have been selected as the supplier for a particular contract.
Before a contract can be awarded, a selection process is likely to have been undertaken which might involve:
- Adverts placed, or recommendations received for a long list of potential tenderers.
- A pre-qualification process.
- Identification of a short list to be invited to tender.
- An invitation to tender.
- Tender receipt.
- Interview.
- Selection of preferred tenderer(s).
- Negotiation.
- Contract award.
- Contract engrossment (printing) and execution (signing as a deed or as a simple contract).
[edit] Selection criteria
There are a number of different bases upon which a contract can be awarded:
[edit] Lowest price
In this simple method, the lowest priced tender (or best price) wins the contract. However, following this method excludes other elements of the tender, such as relevant experience, being taken into consideration when awarding the contract and does not always result in best long-term value for the client. Low prices can produce low quality, or result in claims and conflict between the client and the supplier.
[edit] Most economically advantageous tender (MEAT)
This method allows for factors other than, or in addition to, the price to be taken into consideration, such as quality, experience, competence, capability, capacity, estimated time for completion, life cycle costs, and so on. If this method of awarding is to be used, it should be set out in the tender documents, along with the system of weighting that will be applied to each of the selection criteria.
For more information, see Most Economically Advantageous Tender (MEAT).
[edit] Mean value
This method awards the contract to the bid that is closest to the mean value of the proposals. This is commonly adopted where numerous proposals are expected, but can leave suppliers uncertain where to pitch their bid.
[edit] Exclusion of the extremes
This method is used to take away the bids that deviate most, lowest and highest, before then proceeding with one of the three methods above.
[edit] Contract award procedure
Once the successful tenderer has been selected a period of negotiation will begin. A reserve tenderer may be retained in the event that negotiations with the preferred tenderer are unsuccessful.
A tender report may then be prepared providing a brief history of the tendering process and an analysis of each tender submission and any subsequent negotiations and concluding with a recommendation.
All tenderers should be informed of the decision to award the contract to a particular tenderer.
If OJEU procedures are being followed, it may be necessary to publish a formal contract award notice once the successful tenderer has been selected. A ‘standstill period’ may then be required. This is a pause of at least 10 calendar days between the decision being notified to all tenderers and the final contract conclusion. This allows for suppliers to challenge the decision.
The contract administrator (or sometimes the cost consultant) then collates the contract documents and arranges for the printing (engrossment) and execution of two copies, one for the client and one for the supplier. Alternatively, the client might retain one executed contract, with certified copies being issued to the supplier, this can avoid potential errors in preparing two contracts for execution. The supplier may be required to provide a performance bond, warranties, evidence of insurance cover, and so on.
Contract award and contract execution may not necessarily happen at the same time. In fact it is relatively common (although not advisable) for contracts to remain unsigned until well after work has begun.
Contracts may be executed under seal (signed by the parties, witnessed and most importantly made clear that they are executed as a deed) or under hand (a 'simple contract' that is just signed by the parties). See Contracts under seal v under hand for more information.
[edit] Award notice
An award notice is a public notice that may be required under OJEU procurement rules that notifies interested parties of a contract award and sets out information about the process that led to the award.
[edit] Related articles on Designing Buildings
- Back to back provisions in construction contacts.
- Best value procurement.
- Bid evaluation.
- Compliant bid.
- Contracts under seal v under hand.
- Construction contract.
- Contract conditions.
- Contract documents.
- Contract negotiation.
- Engrossment.
- ESignatures.
- Guaranteed maximum price.
- Letter of award.
- Most Economically Advantageous Tender (MEAT).
- Negotiated contract.
- OJEU procurement procedures.
- Procurement route.
- Record keeping.
- Sub-contract.
- Tender documentation.
- Tender processes.
Featured articles and news
Solar panels, pitched roofs and risk of fire spread
60% increase in solar panel fires prompts tests and installation warnings.
Modernising heat networks with Heat interface unit
Why HIUs hold the key to efficiency upgrades.
Reflecting on the work of the CIOB Academy
Looking back on 2025 and where it's going next.
Procurement in construction: Knowledge hub
Brief, overview, key articles and over 1000 more covering procurement.
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.